offshore pipelaying
Project:
This contract was for the fabrication of an integrated deck for an offshore pipe laying vessel. The most significant challenge in this project was ensuring the sliding operation of the deck worked smoothly and efficiently.
Scope of work:
Marine Sector
Fabrication Weight: 200te
Overall Weight: 220te

An Integrated Deck for an offshore pipelaying vessel

This contract was for the fabrication of an integrated deck for an offshore pipelaying vessel which would be installing rigid pipelines in deep water.

Incorporated into the fabrication was a floating deck which when installed on the vessel interfaced with the vessel’s J Lay Tower.

This fabrication was a major challenge in respect to the final tolerance required to ensure that the sliding operation of the floating deck worked smoothly.

The WD Close project team collaborated closely with the client’s team on the final fit out.

To gain an insight into our fabrication processes, view our other case studies.